총 비용
-
공임
-
부품비
-
소요 시간
-
2026. 8. 13. 작업
Suzuki Hustler (MR52S/MR92S) | LED work light installation preparation | Step 1: Connected 2 7-inch LED work lights to create one light bar. Planning to mount on front pipe bumper guard, but there's not enough space to arrange both units side-by-side with the included brackets, so will connect them at the center and secure both sides. Running the cable to the left side, so the heat fin side of the unit faces upward. | Step 2: Purchased stainless M5x20mm set screw from Kohnan Pro, and using 2 nuts and 2 polycarbonate washers on hand to connect at the center screw hole.
Suzuki Hustler (MR52S/MR92S) | LED work light installation preparation | Step 1: Connected 2 7-inch LED work lights to create one light bar. Planning to mount on front pipe bumper guard, but there's not enough space to arrange both units side-by-side with the included brackets, so will connect them at the center and secure both sides. Running the cable to the left side, so the heat fin side of the unit faces upward. | Step 2: Purchased stainless M5x20mm set screw from Kohnan Pro, and using 2 nuts and 2 polycarbonate washers on hand to connect at the center screw hole.
출처
이 사례는 みんカラ (일본)에서 수집한 데이터입니다.
신뢰도 3.0점(보통) — 출처 소스의 전문성/검증구조를 기준으로 산정된 점수이며, 정확성을 보장하지 않습니다.
원문 보기 ↗